      100噸電子汽車衡(出口式裝集箱設計)安裝指南

      更新時間:2015-01-21      瀏覽次數:520

      100噸電子汽車衡(出口式裝集箱設計)安裝指南

      Simple installation steps

      1.  Check all goods against list, pay attention to the steel-seal letterA1A2A3A4A5A6A7A8A9A10A11A12 on the surface of the scale-bodies, load cells, tools wooden cases and indicator (See the following figure).Be ready to install

      A2                      A4

      A6                       A8

      A10                      A12

                                  A1                      A3                  

                                  A5                      A7

                                                         A9                       A11

       2.  Scale-body assembling:

         Lift the scale-bodies of corresponding marking with the 28mm shackle and assemble with a crane (usually 15t), overturn and lie them flat(pad wood under the scale bodies to prevent the paint scaling off), attention to the marking.the marking of A1A3 with the marking of A2A4 of the scale-body, the marking of A5A7 with the marking of A6A8 of the scale-body , the marking of A9A11 with the marking of A10A12 of the scale-body,  then tighten the scale-bodies with 96 sets of M20X60 socket head cap bolts with M30 adjustable spanner,M20 socket head cap spanner and φ30x500mm lever. Each pair of bolts including 2washer, 1 spring washer and 1 thickening nut. See the following figure:

       3. Installing load cell

         Tighten the M16X45 bolts with the lever. Each pair of bolts is including 1 washer and 1 spring washer.

           (Note: The marking on the load cell and scale-body should be consistent.)

      Note:a. Install the load cell directly on the back of the markings A1A2A11A12 of the scale-bodies.

      b. Install the load cell on connecting-plate of the scale-bodies markings A3A4A7A8 of the scale-bodies.

       Installation drawing of load cell:

       4.  Place the scale-body into the completed pit

          4.1  Fix up one end of the four steel cable in the same length into the installation hole  on the scale-body which marked A1A2A3A4 using the shackle, the other end of the steel cable should cover with the crane. Ensure the scale-body in level when lifting. The degree of angle of the steel cable should not less than 45°.

          4.2  Lift the scale-body above the foundation slowly, put δ25~δ30mm thicken wood plate between the scale-body and the walls of the foundation pit to guarantee the scale-body into center place. Then put the load cell's steel ball and base-plate of ball-bowl on the foundation plate. Position scale-body into the foundation .See the following figure:

      100噸電子地磅(出口式裝集箱設計)安裝指南                           

      Thicken Wood

       4.3  Install the second-section scale-body which marked A5A6A7A8,  ensure the marking  A5A6 of  the second-section scale-body should be corresponding with the marking A3A4 of  the first-section scale-body. Place this scale-body into foundation pit slowly and attention to the position of the joint. make sure the joint hole of joint should be corresponding with the connect forelock of the first section scale-body.attention to adjusting the clearance about 56mm between the two sections of scale-bodies. The clearance around the scale-body is roundly the same. See the following figure:

       4.4 Lift and install the third-section scale-body(which marked A9A10A11A12)ensure the  

       marking A9A 10 of the third-section scale-body should be corresponding with the marking A7A8 of  the second-section scale-body. The installation step the same as the first and second section

      scale-body.

       5.  Adjust the scale-body after placing is finished.

      5.1. Check the eight steel-ball of load cell, If the steel-ball can be rotated, jack the scale-body up in that position with the jack and put the level-adjusting plate under the installation plate for load cell to make sure the steel-ball can't be rotated.

      5.2. Adjust the M30x85 common limit bolts of the scale-body. (Rotate the bolt, it is better that there is 5mm between the front-end of the bolt and the surface of scale-body, then rotate the nut.) In order to avoid weighing accurate is not good from big rocking when the truck drives on the scale.

       6.  Pass out the signal cable from the passing-tube. Tie up the signal cable on the iron wire in the passing-tube when passing. Then pull the iron wire to achieve the goal of passing. Next join the signal cable to the junction box. (Attention to the marking on load cell and junction box should be consistent), then fix up the junction box onto the two side-cover plates.) Then fixup the junction box on the side cover-plate of the scale-body.

      7.  Fixup one end of the ground-cable onto the connecting-plate using M16 bolts, and fix up the other end of the ground-cable onto ball-bowl base under-press using M12 bolts to let the load cell short-connection, it will protects the load cell from damage by lightning when they are working.

      100噸電子地磅(出口式裝集箱設計)安裝指南

                                                   ground-cable

       8.  Install the side-cover plate of the load cell: fixup the the cover-plate of load cell on the scale-body with 24 sets of M10×25 stainless steel common bolts.  attention to the marking on the side-cover plate and the scale-body should be consistent.

      9.  Install the bracket: fixup the bracket on the side of the scale-body with the 36 sets of M16×35 common bolts(each pair including 1 washer, 1 spring washer, zinc-galvanizing treatment) 

      10.  Pass out the signal cable from the PVC tube in foundation and join it into the pounds-room.

      11.  The installation is finished.

      100噸電子汽車衡(出口式裝集箱設計)安裝指南


      掃碼添加微信
      13816853446

      地址:上海市奉賢區奉浦大道97號綠地智尊A座1120-1123號

      服務熱線
      13816853446

      掃碼添加微信

      主站蜘蛛池模板: 欧美又大粗又黄又爽无码| 久久综合亚洲欧美成人小说影院| 午夜a理论片在线播放| AV秘 无码一区二| 91久久精品无码一区二区五月天| 亚洲AV成人无码网站| 日本人妻永久视频网站| 日本一本草久在线中文| 园内精品自拍视频在线播放| 久久福利资源站免费观看i| 国产在线观看网址不卡一区| 99re8这里有精品热视频地址| 亚洲va中文字幕欧美va丝袜| 亚洲av成人一区二区| 国产亚洲精品视频一二区| 中文字幕亚洲日韩无线码| 久久婷婷五月综合色99啪ak| 制服丝袜国产精品| 亚洲AV日韩AV无码| 亚洲国产成人精品福利| 内射中出无码护士在线| 无码精品国产va在线观看DvD | 国产精品久久久久久久免费AⅤ| 曰韩高清砖码一二区视频| 久久久久久久被弄到高潮| 国产黑色丝袜在线播放| 丝袜精品国产香蕉在线| 国产午夜福利在线观看播放| 成年女人永久免费看片| 国产精品中文原创AV| 永久免费无码成人网站| 日韩精品无码久久久不卡| 国产青草视频免费视频| 亚洲AV无码片一区二区三区| 亚洲AV一本岛在线播放| 成年无码高潮喷水AV片线段| 亚洲人成线无码7777| 国产精品一区二区久久不卡| 亚洲国产国语自产精品| 免费萌白酱国产一区二区| 99九九精品毛片免费播放高潮中文 |